Thursday, 12 September 2024

ASO OFI

 



COST OF THE WEAVER SCULPTURE OF THE HOME OF ASO OFI



COSTS OF GATEWAYS OF OKE OGUN STATUS 

A.      MEDIUM SIZE

COSTS OF MATERIALS 

1. Stone dust 2 loads  65000/1 =                         130,000

2. Cements 20bags   4000/1  =                               80,000

3. Reinforcement rods lengths 5000/1                100,000

4. Ordinary sand filling 2 loads  15000/1              30,000

5. Chicken wires 3rolls   10000/1                            30,000

6. Binding wires  7rolls  1000/1                                7,000

7. Electrodes        1pack                                           10,000

8. Covering typlin cost                                             60,000

9. Form works wooden cost

     a. 10lengs 4x4   1200/1                                       12,000

     b. 10lengs 12x1  2000/1                                      20,000

     c.  10lengs plywood 15000/1                            150,000

     d. Types of nails                                                    20,000 

10. Finishing materials cost

     a. Metallic  primer 1gallon                                  20,000

     b. Undercoat paint 1gallon                                 20,000

     c. Finishing paint 2gallons   20000/1                 40,000

     d. Golden dust     2tins    20000/1                        40,000


TOTAL COSTS OF MATERIALS                 =            769,000


OTHER COSTS/WORKMENSHIPS COSTS

    A. Preliminary cost                                              40,000

    B. Carpentries cost                                               50,000

    C. Welding cost                                                     50,000

    D. Constructing cost                                            20,000

    E. Finishing /commissioning mark cost          90,000

    F. Artist cost                                                       500,000

    G. Miscellaneous cost                                       250,000


TOTAL WORKING COST                                     1,000,000

    

A. TOTAL FOR MEDIUM SIZE STATU 7feets    1,769,000



       B.   LARGE SIZE STATU  


COSTS OF MATERIALS 

1. Stone dust 3loads  65000/1 =                          195,000

2. Cements 25bags   4000/1  =                             100,000

3. Reinforcement rods 27lengths 5000/1          150,000

4. Ordinary sand filling 3loads  15000/1             45,000

5. Chicken wires 5rolls   10000/1                           50,000

6. Binding wires 9rolls  1000/1                                9,000

7. Electrodes        2packs                                         20,000

8. Covering typlin cost                                            70,000

9. Form works wooden cost

     a. 16lengs 4x4   1200/1                                       19,000

     b. 17lengs 12x1  2000/1                                      34,000

     c.  12lengs plywood 15000/1                           180,000

     d. Types of nails                                                   30,000 

10. Finishing materials cost

     a. Metallic  primer 2gallons                              40,000

     b. Undercoat paint 2gallons                              40,000

     c. Finishing paint 4gallons   20000/1               80,000

     d. Golden dust     4tins    20000/1                     80,000


TOTAL COSTS OF MATERIALS                 =       1,162,000        


OTHER COSTS/WORKMENSHIPS COSTS

    A. Preliminary cost                                              55,000

    B. Carpentries cost                                               80,000

    C. Welding cost                                                     90,000

    D. Constructing cost                                            36,000

    E. Finishing /commissioning mark cost        150,000

    F. Artist cost                                                        825,000

    G. Miscellaneous cost                                        292,000


TOTAL WORKING COST                                     1,528,000

    

B. TOTAL  FOR LARGE SIZE STATU  10 fts      2,690,000



            C. TOTAL FOR EXRA LARGE SIZE  12fts        

COSTS OF MATERIALS 
1. Stone dust 4loads  65000/1 =                           260,000
2. Cements 30bags   4000/1  =                              120,000
3. Reinforcement rods 35lengths 5000/1           170,000
4. Ordinary sand filling 4loads  15000/1              60,000
5. Chicken wires 7rolls   10000/1                           70,000
6. Binding wires 12rolls  1000/1                            12,000
7. Electrodes        3packs                                         30,000
8. Covering typlin cost                                            80,000
9. Form works wooden cost
     a. 25lengs 4x4   1200/1                                       30,000
     b. 23lengs 12x1  2000/1                                     46,000
     c. 15lengs plywood 15000/1                           225,000
     d. Types of nails                                                 40,000 
10. Finishing materials cost
     a. Metallic  primer 3gallons                             60,000
     b. Undercoat paint 3gallons                             60,000
     c. Finishing paint 5gallons   20000/1            100,000
     d. Golden dust     5tins    20000/1                  100,000

TOTAL COSTS OF MATERIALS                 =      1,463,000        

OTHER COSTS/WORKMENSHIPS COSTS
    A. Preliminary cost                                              65,000
    B. Carpentries cost                                            100,000
    C. Welding cost                                                   120,000
    D. Constructing cost                                             40,000
    E. Finishing /commissioning mark cost         200,000
    F. Artist cost                                                         950,000
    G. Miscellaneous cost                                        322,000

TOTAL WORKING COST                                     1,797,000
     
    TOTAL FOR EXRA LARGE SIZE  12fts          3,260,000.